Natura A.E. has implemented a wide range of environmental and planting works along major roadways and railway lines throughout Greece. These include slope stabilisation, revegetation with hydroseeding, and ongoing maintenance of highway and railway corridors, contributing significantly to the ecological upgrade of transport infrastructure.

  • Vegetation and slope stabilisation along the Elefsina–Korinthos double railway line (sections: Elefsina Toll – K.N. Perama, K.N. Perama – Megara, Ag. Theodoroi – Isthmus), ERGOSE SA, €2,923,497.36
  • Slope restoration and 3-year green maintenance, Elefsina–Korinthos railway section from Isthmus Bridge to Ancient Korinthos, ERGOSE SA, €1,211,078.57
  • National Road Korinthos–Tripoli, KM 104+000 – 115+000, planting and maintenance, Ministry of Infrastructure (YPEXODE), €674,981.66
  • National Road Korinthos–Tripoli, KM 115+000 – 122+500, planting and maintenance, YPEXODE, €645,634.63
  • National Road Korinthos–Tripoli, KM 122+500 – 128+500, planting and maintenance, YPEXODE, €440,205.43
  • National Road Korinthos–Tripoli, KM 98+500 – 104+000, planting and maintenance, YPEXODE, €96,625.09
  • Megalopolis Bypass (KM 0+000 – KM 10+000), planting and maintenance, YPEXODE, €255,319.15
  • Megalopolis Lignite Mine – slope restoration at Thoknia deposit (hydroseeding, planting and maintenance), PPC Megalopolis, €180,000.00
  • Megalopolis landscaping and planting works, PPC Megalopolis, €880,410.86
  • Thivon–Athens Avenue, planting and lawn installation, YPEXODE, €88,041.09
    Vouliagmeni Avenue, lawn installation, YPEXODE, €58,694.06
  • National Road Korinthos–Tripoli, KM 91+000 – 95+000, YPEXODE, €264,123.26
  • National Road Korinthos–Tripoli, KM 95+000 – 98+500, YPEXODE, €176,082.17
  • National Road Korinthos–Tripoli, KM 98+500 – 104+000, YPEXODE, €264,123.26

Total Budget: €5,978,462.00